WA Gold Mine Gets Faster Post-Blast Surveys & Better Grade Control With Remote Drones
At their Binduli operation in WA, Norton Gold Fields operates multiple open pits that feed a single central processing plant. With the plant running at capacity, any waste rock that makes it into the mill reduces overall gold recovery. That’s why their Head of Geology wanted faster, more reliable blast-survey data. Accurate dig boundaries meant the difference between sending high-grade ore to the plant or the waste dump.